
Solar park battery in western Estonia: up to 10× the revenue.
- Revenue
- Up to 10× vs solar only
- Payback (this project)
- ~2 years
- Commissioned
- In 2 months
References
Batteries running in Estonia, Finland and Lithuania: energy parks, industry, farms and retail. 14 of our 50+ projects are published here as references.
Talk to usPinned: project regions as published

All references

Up to 10× more revenue

Daily reserve-market income

Less curtailment, more income

Lower peaks, plus grid income

Up to 30% lower costs

Cheaper EV charging

Mostly own solar, plus market income

Grain dryer on own solar

One battery, two grid connections

Markets all year, dryer in season

Lower peaks, market income

Grid connection in use all year

Running since 2023

Installed, being commissioned
More than 50 projects, with more than 300 battery storage units sold. 14 of them are published here as references.
We build 50 kW – 10 MW systems. The published references run from a 40 kW / 103 kWh battery at a food producer to a 640 kW / 4 MWh battery at a wood-processing site and a 2 MW / 4 MWh battery beside a 6 MW wind park.
Nordess batteries run in Estonia, Finland and Lithuania. The 14 published references are in Estonia and Finland; the Lithuanian project at Vilnius University was built with a partner.
Up to ten times the revenue of solar alone at a western Estonia solar park, where that project paid back in about two years (our typical estimate is about 3 years), and up to 30% lower electricity costs across three retail stores. Each reference shows the system, the markets it earns on and the result.
The battery at the EV charging site was delivered within one month, and the 1 MW / 2 MWh battery in western Estonia was delivered and commissioned within two months.