Agricultural company Jahvataja OÜ in Ida-Viru County added a 945 kW / 1,935 kWh Nordess battery next to its solar park, built with grant support. Since October 2025 the battery earns on the energy markets and powers the grain dryer in the drying season. The ZOE cabinets stand two high on a covered steel rack.
- Client
- Jahvataja OÜ
- Location
- Ida-Viru County
- Segment
- Business & industry
- Battery power
- 945 kW
- Storage capacity
- 1.935 MWh
- Battery maker
- ZOE
- Storage duration
- 2 h capacity ÷ power
- Connected to
- Solar park, grain dryer
- Earns on
- Energy markets, seasonal self-consumption
- Commissioned
- October 2025
- Funding
- Built with grant support
- Installation
- Cabinets two high on a covered rack
From challenge
to result.
Battery · 945 kW / 1.935 MWh
-
Challenge
Jahvataja OÜ is an agricultural company in Ida-Viru County with its own solar park and a grain dryer.
Jahvataja already had a solar park. With grant support available, a battery was a good investment: it could earn on the energy markets and power the grain dryer in the drying season.
-
Solution
Nordess supplied a 945 kW / 1,935 kWh battery of ZOE cabinets, built with grant support and commissioned in October 2025.
The cabinets stand two high on a covered steel rack, so the battery takes up little room in the yard.
-
Results
- Running since October 2025.
- Earns on the energy markets and powers the grain dryer in season.
- Results have not been published yet.
About this project.
What does the battery do on the farm?+
It earns on the energy markets for most of the year and powers the grain dryer in the drying season.
Why are the battery cabinets on a rack?+
The ZOE cabinets stand two high on a covered steel rack, so the battery takes up little room in the yard.
Was the project built with a grant?+
Yes, the battery was built with grant support, next to the solar park the farm already had.
How big is the system?+
945 kW / 1,935 kWh, commissioned in October 2025.