Turn your energy costs into an advantage

Smart battery systems for energy parks, industry and commercial sites in the Baltics, Eastern Europe and Finland. We size and deliver each system and connect it to the electricity markets.

·

Completed projects

Battery container beside a wind turbine on Saaremaa
Saaremaa · 2 MW / 4 MWh beside 6 MW of wind

Projects in Estonia, Finland and Lithuania

We have delivered projects for energy parks, industry, retail and farms. Our team has ten years of battery experience, and we are now growing across the Baltics and Eastern Europe.

50+
projects
300+
battery systems
80 MWh
of storage

Running in Estonia · Finland · Lithuania

Our battery systems

50kW – 10MW

Sized for your site We build 50 kW – 10 MW systems. Every system is sized from your own data.

Typical delivery

1month

Quick start-up We handle the equipment, paperwork and setup as one project, so the battery starts earning as soon as possible. Larger systems take more time.

  • Small projects running in about a month
  • Payback about 3 years*
  • One contract, one contact
*Estimate based on the last 2 years of Nordess projects.

How the battery earns

Electricity prices change every hour. A battery charges when power is cheap and uses or sells it when prices are high.

Illustrative electricity price over one day: low at night, lowest at midday, highest in the evening. The battery charges at night, stores solar at midday and sells at the evening peak. 00:0006:0012:0018:0024:00
  • Night

    Charges when power is cheap

    The battery fills up from the grid while prices are low.

  • Midday

    Stores your own solar power

    Surplus solar is stored instead of being sold cheaply or curtailed.

  • Evening peak

    Uses or sells it at high prices

    Stored energy cuts your peak and earns when prices are high.

Illustrative day. Prices change every day, and grid-balancing income comes on top.

A solution for every site

Results from our projects

14 published references
Row of white battery cabinets beside solar panels under an evening sky in western Estonia
Western Estonia solar park · 1 MW / 2 MWh

Same solar park, up to 10× the revenue

Best published result · western Estonia solar park. Results depend on the site.

A renewable energy operator in western Estonia added a battery to its solar park. It now stores surplus instead of selling it all at midday prices.

10×

revenue vs solar only, up to
Payback, this project
~2 years
Battery
1 MW / 2 MWh
Read the full story

Project journey
from idea to commissioning

  1. First contact

    1–3 days

    We ask for consumption data, site details and goals.

  2. Analysis & validation

    A few days – 2 weeks

    Grid capacity checked, savings estimated, battery sized.

  3. Decision & contract

    Quick

    One contract for the whole project.

  4. Preparation & delivery

    About 1 month for smaller projects · up to 8 months for the largest

    Documentation, equipment and timeline.

  5. Testing & handover

    1–2 weeks

    Setup, testing and training on site. Then an optimisation partner runs the battery on the markets.

Battery storage
in brief

All articles

Frequently asked questions

What does Nordess do?

Nordess sizes, supplies and connects battery storage for energy parks, businesses and installation partners in the Baltics, Eastern Europe and Finland. We have delivered 50+ projects and sold 300+ battery systems.

How quickly does a battery pay for itself?

In about 3 years, an estimate based on the last 2 years of Nordess projects. The actual figure depends on your site, the battery size and the markets it earns on. We estimate it from your own data before you commit.

How long until the battery is running?

Smaller projects are usually running about a month after the decision. The largest systems take up to 8 months, mostly because of manufacturing and shipping.

Who runs the battery after handover?

An optimisation partner operates it and trades its flexibility on the markets, so you never trade energy yourself. We help you choose the partner and stay your contact.

Do I need a licence to earn on the energy markets?

No. Businesses take part in aFRR and mFRR by reducing their own consumption, not by selling power to the grid. An optimisation partner handles the market side.

What does a battery cost?

It depends on the size and the site. We size the system from your consumption data and give you a first estimate of cost, savings and payback before any commitment.

Are there subsidies?

Yes, there are grants for energy storage in Estonia. We help with the application.