Rocca al Mare shopping centre: a 1 MW battery, now being commissioned.
Battery · 1 MW / 1.1 MWh At a glance.
Citycon, which already runs batteries at its shopping centres in Finland, has installed a 1 MW / 1.1 MWh Nordess battery at Rocca al Mare in Tallinn. The battery was installed in October 2026 and is being commissioned. Once running, it will cover the centre's peak loads and earn on the energy markets.
- Client
- Citycon
- Location
- Tallinn
- Segment
- Business & industry
- Battery power
- 1 MW
- Storage capacity
- 1.1 MWh
- Battery maker
- Pixii
- Storage duration
- 1.1 h capacity ÷ power
- Connected to
- Shopping centre grid connection
- Earns on
- Planned: peak shaving, energy markets
- Status
- Installed, being commissioned
- Installed
- October 2026
- Planned use
- Peak shaving, energy markets
From challenge
to result.
Battery · 1 MW / 1.1 MWh
-
Challenge
Rocca al Mare is a shopping centre in Tallinn owned by Citycon.
Citycon already has batteries at its shopping centres in Finland and decided to add one in Estonia, at Rocca al Mare.
-
Solution
Nordess supplied a 1 MW / 1.1 MWh battery made of Pixii cabinets. It was installed in October 2026.
The battery is being commissioned and is not in operation yet. Once running, it will cover the centre's peak loads and earn on the energy markets.
-
Results
- Installed in October 2026; commissioning is under way.
- No operating results yet.
- Planned use: peak shaving and the energy markets.
About this project.
Is the Rocca al Mare battery already running?+
Not yet. It was installed in October 2026 and is being commissioned.
What will the battery do?+
It will cover the shopping centre's peak loads and earn on the energy markets.
Why did Citycon choose a battery?+
Citycon already has batteries at its shopping centres in Finland and decided to add one in Estonia.
How big is the system?+
1 MW / 1.1 MWh, built from Pixii battery cabinets.