Charge while power is cheap.
Night prices are usually the lowest of the day. The battery fills from the grid, automatically.

The same battery earns in four ways, every day, run automatically. Scroll through 24 hours.

Night prices are usually the lowest of the day. The battery fills from the grid, automatically.

At midday the panels can make more than the site uses. Instead of exporting cheaply or curtailing, the surplus goes into storage.

When demand and prices jump, the battery feeds the site. The site draws less from the grid, and stored energy is sold high.

Between cycles the battery stands by for grid balancing (aFRR / mFRR). The grid pays to keep it ready. You never trade anything yourself.
Five stages, with the durations we see in practice. Smaller projects are usually delivered in about a month after the decision. Larger systems take up to 8 months, mostly manufacturing and shipping.
A few emails and one or two calls. We ask for consumption data, site details and your goals.
We check the grid contract and grid capacity, estimate savings and income, support your financial analysis, help choose an energy trader and size the battery.
You decide. One contract covers the agreed scope.
Documentation, equipment order and project timeline. Larger systems take longer because of manufacturing and shipping from China.
Setup, testing, training and final documentation. Then the battery starts earning.
Stage one starts with your consumption data. Send it over and we come back with a first view of your site.
Talk to usSmaller projects are usually running about a month after the decision; the largest take up to 8 months. Before the decision, first contact takes 1–3 days and the analysis a few days to 2 weeks.
Your consumption data (or production data for a park), site details, your grid contract and grid capacity, and your goals. That is enough for a first estimate of battery size, savings and payback.
Mostly manufacturing and shipping. Small cabinet systems can be delivered quickly, while large container systems are built to order and shipped from China.
One contract covers the agreed scope: sizing, hardware, help with grid paperwork and grants, testing, training and the market connection. You have one contact from start to finish.
Setup, testing, training on site and final documentation, usually within 1–2 weeks. Then the battery starts earning.
An optimisation partner runs it on the markets automatically, so you never trade yourself. We help you choose the partner during the analysis and stay your contact.